How Snap & Bill calculates tiered water tariffs
The Central Water Authority (CWA) applies tiered tariffs: the price per cubic metre (m³) rises with consumption, and most tariffs carry a minimum charge. How those tiers are applied depends on how CWA classifies the property. Snap & Bill supports three methods and applies the one that matches your CWA account.
1. Flat rate
One price per m³, whatever the volume. Each lot pays its own consumption × the rate.
2. Living quarters (residential)
Where one CWA meter supplies several dwellings, CWA can bill per living quarter: each dwelling is entitled to its own set of tariff brackets, including the lower-priced first bracket and its own minimum charge, as if it had its own CWA meter.
Snap & Bill reproduces this by applying the full tariff table to each lot’s own consumption. A lot using little water stays in the low brackets; a heavy user moves into the higher ones. No lot is penalised by its neighbours’ consumption.
3. Building-level tiered tariff
Some properties are billed by CWA as a single consumer: the tiers and the minimum charge apply once to the whole building’s volume, not per dwelling. Snap & Bill shares that single bill fairly using a blended rate.
The method
- Volume billed by CWA (C): entered from the CWA bill for the period.
- Building bill (T): calculated by Snap & Bill from C and the official CWA tariff, minimum charge included.
- Blended rate (r) = T ÷ C, the average price of one m³ for the building that period.
- Each lot pays its metered m³ × r.
- Common share = T − the total charged to lots. It covers water not recorded by lot meters: common areas, leaks, and small differences between CWA’s and the lots’ reading dates. It is shown separately for the syndic.
Every lot pays the same price per m³ for a given period, traceable straight back to the CWA bill. The rate can vary from one period to the next, because the building’s total consumption determines which tiers apply.
Example
Business tariff (Tariff 14): minimum charge Rs 1,234 for the first 33 m³, Rs 39/m³ from 34 to 100 m³, Rs 41/m³ from 101 to 1,000 m³.
| Volume billed by CWA (C) | 500 m³ |
| Building bill (T) = 1,234 + 67 × 39 + 400 × 41 | Rs 20,247.00 |
| Blended rate (r) = 20,247 ÷ 500 | Rs 40.494 / m³ |
| A lot that used 50 m³ pays 50 × 40.494 | Rs 2,024.70 |
| Lots’ meters total 460 m³ → lots pay | Rs 18,627.24 |
| Common share (40 m³ not recorded by lots) | Rs 1,619.76 |
When consumption is below the minimum
If the building uses less than the volume covered by the minimum charge, CWA still bills the minimum. The same method applies: the minimum is divided by the volume actually used. With 20 m³ billed, r = 1,234 ÷ 20 = Rs 61.70/m³. The rate is higher than usual, but the total charged is still exactly the CWA minimum. This mainly occurs in vacant or newly delivered buildings.
Corrections
If a lot’s reading is corrected, its bill is recalculated using the same period’s blended rate. Other lots are not affected; only the common share adjusts. If the CWA volume itself was entered incorrectly, the whole period is recalculated.
The amounts above are illustrative. The calculation uses the CWA tariff configured for your property.